Generic Description:
This is a revised version of our schedule, after it was verified that the designing phase of Round 3, in the previous one, was set range from March 10 to March 12 (2 days), instead of March 10 to March 19 (the usual 9 days). It also affected the rest of the schedule. This new schedule fix this.
You are a guest ( Sign Up ? )
Be the first to comment.